| Value | Category | Cases | |
|---|---|---|---|
| 11 | Flush / Pour flush, Flush to piped sewer system | 29 |
1.1%
|
| 12 | Flush / Pour flush, Flush to septic tank | 0 |
0%
|
| 13 | Flush / Pour flush, Flush to pit (latrine) | 1 |
0%
|
| 15 | Flush / Pour flush, Flush to unknown place /Not sure/ | 0 |
0%
|
| 21 | Pit latrine, Ventilated Improved Pit latrine (VIP) | 40 |
1.5%
|
| 22 | Pit latrine, Pit latrine with slab | 1975 |
75.2%
|
| 23 | Pit latrine, Pit latrine without slab/Open it | 424 |
16.1%
|
| 31 | Composting toilet | 1 |
0%
|
| 95 | No facility, Bush, Field | 153 |
5.8%
|
| 96 | Other (specify) | 3 |
0.1%
|
| 99 | Missing | 0 |
0%
|
| Sysmiss | 24 |